Trusted by Property Owners, Landlords & Legal Teams
Evidence-led forensic diagnostics backed by chartered credentials and court-tested methodology.
What Defects Reveal
Subsidence Cracking
Diagonal fractures tracking from window corners to foundations. Clay shrinkage. Tree root desiccation. The soil is moving.
Penetrating Damp
Tide marks on internal walls. Failed cavity trays. Bridged DPCs. The water has found its path.
Roof Spread
Lateral thrust pushing walls outward. Missing collar ties. Rafter feet rotating. The geometry is failing.
Concrete Spalling
Carbonation front advancing. Rebar corroding. Cover depths inadequate. The structure is consuming itself.
Service Tiers
— fixed-fee forensic servicesTier 1 — Free Triage
FREE- — 4-photo visual assessment with preliminary defect classification
- — HHSRS Category 1/2 hazard flagging per Housing Act 2004
- — Written triage summary with next-step recommendation
- — Priority referral to paid scope if further investigation required
Tier 2 — Standard Defect Report
- — On-site forensic inspection (Protimeter + FLIR)
- — Root cause analysis with chain-of-causation trace
- — HHSRS Category 1/2 hazard mapping
- — Court-ready PDF with photographic evidence plates
Tier 3 — Complex / Leasehold-Dispute Report
£795- — Tier 2 scope plus extended forensic investigation
- — Designed for leasehold disputes and multi-defect properties
- — CPR35-aligned methodology and chain-of-causation analysis
- — Court-ready PDF with photographic evidence plates
Tier 4 — CPR35 Expert Witness Report
- — CPR35 Part 1 & 2 compliant expert report
- — Statement of truth and declaration of duty to the court
- — Scott Schedule preparation where instructed
- — Suitable for County Court, First-tier Tribunal, HMO licensing
RCA Roadmap
— from instruction to resolutionInstruction
You instruct BPD via the 4-Photo Triage or direct enquiry. We confirm scope, fee, and turnaround. 50% deposit secures your slot.
Evidence Intake
All available documentation received: lease, previous surveys, correspondence with landlord/contractor, planning history. Photographic evidence catalogued.
Inspection
On-site forensic survey. Protimeter moisture mapping. Thermal imaging where instructed. Borescope investigation of concealed voids. All findings recorded to evidence standard.
Production
Root cause analysis compiled. HHSRS hazard assessment scored. Remediation schedule drafted with BS/BRE references. CPR35-compliant report produced with photographic plates.
Clarification
Draft report issued for your review. One round of clarifications included. Final report delivered as court-ready PDF. Balance of fee due on delivery.